Boat Projects - Priority Matrix
Post written by Marissa, - UpdatedWe got the idea to make this straight out of Don Casey’s This Old Boat, and it seems to work well.
‡ - indicates the task is in-progress.
Immediate | |
---|---|
Safety | none ✅ |
Immediate | Less Urgent | Someday | |
---|---|---|---|
Structure | Diagnose low engine oil pressure, New standing rigging, New main halyard, New jib halyard | Move propane locker drain, replace bronze thru-hulls with plastic, repair sole fiberglass delamination, repair leak above galley, stiff helm | Reduce # of thru-hulls beneath water line to 8 or less (currently: 12) |
Feature | Repair v-berth/anchor locker barrier ‡, audit electrical system ‡ | Galley GFCI outlet backing, replace shower sump pump, replace lazerette latches, replace canvas, fix or relocate light switch in head locker, fix light in engine comp’t | Replace flourescent fixtures, v-berth storage latch, electronics upgrade, hydraulic auto-helm, wind vane, replace water hosing with PEX, replace black water plumbing |
Finish | Repair teak deck | Paint bilge, Clean & paint anchor locker | Replace teak decks, repaint topsides |
Also check out the list of completed projects and upgrades.